2006 The CSG Complex is a Design/Build project competitively won by our team in a two-phase process. The CSG Complex includes facilities for the 526 Command Unit. The project involved the demolition of 18 existing buildings and the design and construction of 5 new, large company operations facilities, 4 new barracks (2 new 312-person and 2, 382-person barracks), 2 battalion headquarters with classrooms, and 1 dining facility for the operational command unit of the 81st...

2007 / 2008 This design/build project includes the development of a new Brigade area within the Fort Stewart Cantonment Zone. The project includes 7, 48-soldier barracks buildings and 1, 3-unit Company Operations Facility spread throughout a 58-acre site. The new 122,976-square foot Barracks Complex for approximately 336 Unaccompanied Enlisted Personnel consists of 7, 3-story concrete buildings in a rectangular footprint with a brick-veneer with gabled metal roofs and a "Southern Coastal" design theme to give a residential...

2012 Design/build project of new Warrior in Transition (WT) Barracks comprised of a 3-story, 134,680-gross square foot barracks consisting of 56, 2-bedroom, 1-bath units and 56, 2-bedroom, 2-bath units.  This WT barracks facility is a new cold-formed steel, loadbearing building. The apartment areas were constructed using panelized wall techniques.  The roof is framed with pre-engineered, cold-formed steel trusses topped with asphalt shingles....

2012 This WT barracks facility is a new 4-story, cold-formed steel, loadbearing building.  The apartment areas were constructed using panelized wall techniques, while the common and service areas were framed using traditional stick methods.  The facility has 5 stair towers and 3 elevators.  The roof is framed with pre-engineered, cold-formed steel trusses topped with asphalt shingles. Registered with the USGBC for LEED Silver Certification....